The other schemes are being delayed for several reasons like, due to non-funding from Municipal Authority, non-availability of sustainable aquifer etc. Railway crossing sanction pending. As soon as the liabilities are cleared, the schemes shall be closed by 31th March Ekauna PWS Scheme District Shravasti scheme id sanctioned in year was delayed due to delay in finalisation of suitable land for Tubewell and water works. New AS received and now work completed. Later Kunnummal Panchayath was dropped as Jalanidhi project sanctioned.

ssr 2012-13 andhra pradesh

Uploader: Mohn
Date Added: 24 October 2013
File Size: 29.80 Mb
Operating Systems: Windows NT/2000/XP/2003/2003/7/8/10 MacOS 10/X
Downloads: 45129
Price: Free* [*Free Regsitration Required]

Out of these, 32 thirty-two nos. Erection of Pump set pending which is re-tendered. Now remaining components arranged. Gudem-The GO for the wok was sanctioned vide dt. Issues between old and new pani Samiti is also a major cause of delay. At the rate, more no.

MediaFire link: AP SSR – Panchayati Raj Engineers

However the main components of the scheme have been completed 72 Wss Karimabad Bala PWS The completion of the scheme got delayed due to the floods of September The scheme will be completed during the andra financial year The Scheme will be completed by Submersible pumps used in PWSS needs three phase electric power connection, which were andhrq available at the work sites.

  MILIGRAM DOBRO JUTRO ANDJELE FREE DOWNLOAD

Also in some cases, surface source have been considered suitable as alternate aquifer.

ssr 2012-13 andhra pradesh

Villages — Delay in getting land for WTP. The scheme can be completed once the full funding is made available.

ssr 2012-13 andhra pradesh

However, it is to inform you that one scheme pending for completion for more than 10 years has already been completed.

Ekauna PWS Scheme District Shravasti scheme id sanctioned in year was delayed due to delay in finalisation of suitable land for Tubewell and water works. However, all PWS projects are likely to be completed within 30th June Out of these, 42 forty-two nos. The concerned Central Ministry of railways is constantly being perused. R and intake chamber. However, the technologies have been finalized and all these schemes are expected to be completed within a reasonable period. The other schemes are being delayed for several reasons like, due to non-funding from Municipal Authority, non-availability of sustainable aquifer etc.

ssr 2012-13 andhra pradesh

New AS received and now work completed. In some of the schemes, sources went dry and due to non availability of reliable source in near by areas the schemes were not completed.

ROU procedures are required to be followed for laying cross country pipelines.

A Ongoing schemes 3to5 years Out of 97 Nos,32 Nos. Scheme is targeted for the current year.

  SMOSH SUPER HEAD ESPLODER X IPA FREE DOWNLOAD

Category: SSR 2012-13

0212-13 The water drawl permission was received only during May, Ten filter points were drilled in Penna River near intake well and motors were installed in the filter points and the scheme was commissioned on The completion of Birdpur No.

For the remaining balance of 23 Nos, all the related works have been completed and only liabilities are to be cleared. Proposal for the same is prepared for approval as AS exceeded.

In most of the cases after administrative approval of the Rural Pipe Water Schemes tenders are not finalised in first attempt due to various reasons.

New AS received for completion of scheme. WASMO makes special efforts to mobilize community support and make sdr aware of benefits to be derived from the scheme and least resistance is offered to the scheme.

As per IMIS status as on dt.

Delay in any activity or at any village causes delay in whole scheme. The reasons for delay are as under: